User Tools

Site Tools


operations:june_2009

June 2009

  • 24th Watcher out-of-focus, refocused. From that on, focus is kept
  • 25th Watcher power failure, computers do not came after main switch trips off (for unknown reasons); UPS does not show on start - after re-plug it worked
  • 26th failure of Bootes 3 telescope, solved by on-site telescope reboot
  • 26th failure of Watcher roof - did not fully open; closed properly, emergency timeout feature worked exactly as expected
operations/june_2009.txt · Last modified: 2009/06/27 00:00 (external edit)